Early accessYou found us early — Done By the Book is free while we finish testing, and the app tells you plainly what's still being verified.
Get your Okotoks basement permit ready
the first time.
Below: everything Okotoks asks for, researched from the municipality's own pages. Better: a free tool that reads a photo of your hand-drawn plan and tells you what's missing — before the permit counter does.
Why bother getting it right first
The paperwork is the cheap part
1 in 5
permit applications audited in Toronto were missing required documents at intake — and cities everywhere are cracking down on incomplete files
$1,200–$8,000
what permit consultants and design firms charge to do this thinking for you
$0
to find out if your own drawing is ready — the free tier covers the whole planning stage
Sources: Toronto Auditor General building-permit audit, Feb 2024; published GTA consultant rate guides. Alberta has its own version of the same problem — that's why Okotoks's list below matters.
The official list
What Okotoks asks for
Researched from okotoks.ca on 2026-07-18. Not yet independently verified — requirements change, and the municipality's own page always has the final say. No fees listed on purpose: fee schedules change, so check the municipality's page for current amounts.
- 1
Metric floor plan
Proposed and existing room layout; each room's use and dimensions; total square footage being developed; window and door sizes; smoke alarm locations.
- 2
Details of any structural changes being proposed
- 3
List of contractors — if the work isn't all your own
- 4
Site plan, elevation plan and engineer's report — only if enlarging or adding windows
Coring the concrete foundation for an egress window requires a professional engineer's report.
- 5
Development Permit — only for a new basement entrance that doesn't meet Land Use Bylaw setbacks
- 6
Permit fee
The town's fee calculator is on its permits page.
How to apply
Apply through the town's online permit application form (forms.okotoks.ca); review is typically 5-10 business days after payment.
Here's the part nobody else does
A list is nice. A checked drawing is ready.
Some of the items above have to appear on your drawing; the rest are forms and documents you gather. Missing items — either kind — are exactly how applications bounce. Done By the Book closes that gap in three steps:
Print the free worksheet
A drawing worksheet built for permit drawings — measurement checklist on one side, sketch grid on the other. Pencil and paper. No signup.
Photograph your sketch
Snap it with your phone. The app reads your hand-drawn plan — room labels, dimensions, windows, the works.
See exactly what's missing
A readiness report, item by item, in your municipality's own terms — with where to write each missing thing on your drawing. Fix, re-scan, repeat until it's ready.
Then it walks the whole build with you
The app won't open the construction stage until your permit is issued — on purpose. After that: a stage-by-stage walkthrough in build order, with inspection checkpoints so nothing gets covered up before it's inspected.
And it shops your materials list around
Quantities from your measurements, with previously recorded prices compared across selected retailers for the purchases we can match fairly. Compare one-store and split-store subtotals for those items. Different-sized packs and unclear products are excluded, not priced at zero. This is not the full project cost or a current local quote. Prices read 2026-07-19; confirm products and current prices before buying.
Who inspects in Okotoks
Town of Okotoks — Permits & Assessmentmunicipal
Phone: 403-995-6304 · website
Book with the Town's online inspection request form; plumbing, gas and electrical inspections run Tuesdays and Thursdays only
8 money programs may apply to a Okotoks basement or suite project
Every program on our list is checked against its official page, with the date shown — including the closed ones that ads still sell. Most of them require a permitted, inspected project, which is exactly what this app gets you.
See the verified money listShow up to the Okotoks counter ready
Sketch it tonight, scan it tonight, and know what's missing tonight. Free to start, works on your phone, in 8 languages — and it never pretends to be the municipality: the final say is always theirs.
Start my Okotoks project — freeDone By the Book is independent, source-linked guidance for homeowners. It is not affiliated with the municipality and never guarantees approval — it helps you show up prepared. Permits in Alberta are required under the Safety Codes Act before regulated building, electrical, plumbing, gas, and HVAC work.
New to this? The Alberta basement development guide walks the whole journey, start to finish